Conversion to a forage transport wagon:

The complete loading and cutting assembly can easily be removed or installed in about 20 minutes. This helps to reduce the machine weight and boosts payload by 2.5 tonnes when being used as a transport trailer. It also makes the loading assembly easy to clean and maintain.

The entire loading assembly is attached to the chassis with just two bolt connections each on the left and right sides. The only other connections involved in installation and removal operations are the hydraulic lines, the spiral tooth clutch of the drive line and the electronic connections. All assembly settings are preserved in the process.

An optional storage frame is available for removal of the assembly. Removing the assembly also makes cleaning and maintenance procedures easier.

All the main steering functions are controlled directly on the wagon

Releasing the hydraulic clutch

Loosening the bolts

Releasing the drive shaft

Inserting the channel cover